The UMI group has four main sites. Three of them principally engaged in the manufacture of parts and equipment, and the headquarters of the group dedicated to the overall management and final assembly of the contracted work packages.

The total area of all facilities 14500m2 amount distributed as follows:

  • Area dedicated to machining: 7500m2
  • Area dedicated to the assembly: 3000m2
  • Area dedicated to storage: 2000m2
  • Area dedicated to office: 2000m2
 